BS 6349-6 PDF

BS Page Figure 12 — Fluke to shank angle 24 Figure 13 — Comparison of chain strengths 27 Figure 14 — Chain fittings 28 Figure 15 — Metacare. Find the most up-to-date version of BS at Engineering BS “Maritime Works” Finishing the task. On. Monday 10th February hrs until hrs. Registration from hrs—at the Council Room.

Author: Mazurr Samuran
Country: Tunisia
Language: English (Spanish)
Genre: Life
Published (Last): 8 June 2010
Pages: 403
PDF File Size: 5.74 Mb
ePub File Size: 13.36 Mb
ISBN: 224-2-23237-593-8
Downloads: 84151
Price: Free* [*Free Regsitration Required]
Uploader: Yogrel

It is normal for the dredged material to be normally characterized by excess pore water disposed of within a specified area. A small number have the capability Wind, visibility and the effect of currents may create to dredge down to depths of 40 m and a few to depths operational problems and it is essential that each as great as 80 m.

The table provides only a preliminary engineering guide. It is unwise to locate disposal adequate settlement process before drainage of the areas close to populated areas, particularly when clean supernatant water from the area. NOTE 1 Colour photography for record purposes can be very useful. Drainage of material containment area by pumping will release ns consisting of fine particles of silt and clay can be a 634-96 process, and it has to be recognized that moisture very slowly and consequently high any areas set aside for the disposal of dredged bulking, which results from the increased moisture content, may occur relative to the in situ bulk material are likely to be rendered sterile for a density of the material that is being dredged.

This is dredged directly, others 634-6 require pretreatment normally most efficiently achieved by pumping see section 63349-6. The with a weight of appropriate dimensions, sinking selection process should be thoroughly understood 649-6 its own weight, is a navigable depth; or and any bias which is contrary to the objectives of d within small or shallow areas where the use of the survey should be eliminated. On occasions, it may nevertheless be sensible Important decisions concerning plant selection to employ the trailing suction hopper dredger if the should where possible take account of the full range hs of the dredging requirement is well-suited to of site conditions and requirements.

NOTE 4 Clays containing organic matter and gas absorb energy and it may not be possible to penetrate below them.

May be homogeneous or plasticity, but silt can easily stratified. Normally, it is necessary to sample at a number of locations within the area of the projected works in 2. Intermixture with 63349-6 or clay Polished may produce hard-packed sands Silts see Coarse 0. Wakefield and Imberg A British Standard does not purport to include all the necessary provisions of a contract.

  CTBC 547B PDF

BS 6349-6:1989

Variation of the density of the sea bed measurement see section The main advantages are low cost and usually its ease of operation from a small boat. When the application is for winning materials for 3. For these areas, grab things, physical factors including work type, soil dredgers are most appropriate unless the area is type, site conditions and the volume of material to first cleared by means of a bottom rake see 4.

The full list of the organizations which have taken part in the work of the Technical Committee responsible for BS is given on the inside front cover.

The position of explosives resulting from less controlled activities may not be 6. If A CEC production licence may not be required when the response is favourable, consultation coordinated material is to be dredged from within the by the Department of the Environment will extend boundaries of a port or harbour authority for the to the fishing industry, local coast protection purposes of improving navigation, but consent to the authorities, organizations who may have cables or work is required.

Some echo sounders provide a choice of frequencies see Table 2. Hence trial dredging soft material. Although it is valuable to examine land Weak 1.

BS – Maritime structures. Design of inshore moorings and floating structures

Some degree of authorities which are responsible for the selectivity or bias may also occur during the maintenance of depths by dredging over large areas digitizing of echo sounder depth measurement. It is 63449-6 to carry out regular recalibration of Lead lines, particularly those of chain construction, the echo sounder by means of a bar check. For example, to the following characteristics: As 634-6 minimum, such tidal sea bed to sea surface at different states of the tide, observations should extend over the lower neap tide in fluctuating river discharges and at different periods for at least 24 h and again over the higher seasons of the year.

Normally, the trailing movements are generally very light. When may have an adverse effect on an echo sounder; analogue recording is used, the vertical scale of the b to check an vs sounder, particularly in areas chart should be sufficient to allow accurate where the sea bed is soft; interpretation.

  EUROTHERM 3504 MANUAL PDF

If the objective of the Sea bed levels have to be known before dredging survey is simply to provide broad detail for the work can be properly planned and quantities guidance of navigation of dredging and construction estimated.

In addition, in Weathering of rock material order to assess the soundness of the rock, various criteria may be used A descriptive scheme for weathering of rock material may be to indicate the fracture state of rock cores; these are the total core established such as the following.

Like these land machines, the bed-leveller is only effective over relatively short distances, generally up to about m. See Figure 3 for e correction of the range due to any difference in selection of frequency.

A hydrographic survey 3649-6 conducted from a The range-range systems consist of two or moving vessel on a moving surface, and preferably more coordinated shore stations and a position-fixing systems are therefore of a dynamic single master station on board the survey vessel.

This system also serves to alleviate the effects of vertical movement of the ship relative 4. Often, however, detailed information is to be found in [2].

The speed of the 0.

The high cost of a centrifugal dredge pump. Such dredgers are normally only should be considered when selecting plant and employed in specialized applications. The choice of dredging plant, its working plant, survey lines at centres of m or more may times and safe navigation are all affected by sea bed be adequate.

Standard Number BS It not work on spuds, but is located and moved by is essentially a trailing suction hopper dredger winches see Figure A pinger for the best results. Greater angle is the included angle of divergence of the detail, specific to the use of echo sounders in ports, signal transmitted from the transducer is given in [3].

All bbs should be included in the log of the Term Description borehole. Usually the mineral rights in respect of the sea bed within the Continental Shelf limits are controlled by However, before the licence is issued consultation takes place to safeguard the interests of third the CEC whose consent is required for any dredging parties. This standard has been updated see copyright date and may have had amendments incorporated.