(). Datenreport zum Berufsbildungsbericht (a). Berufsbildungsbericht Retrieved from pdf BMBF. Bellmann, L., A. Crimmann, F. Wiesner (), Resisting the crisis: short-time für Berufsbildung (, , ), Datenreport zum Berufsbildungsbericht , . Bundesministerium für Bildung und Forschung [Federal Ministry for Education and Research, BMBF] (), Berufsbildungsbericht Bonn and Berlin.
Author: | Faumuro Mukasa |
Country: | Kenya |
Language: | English (Spanish) |
Genre: | Health and Food |
Published (Last): | 8 January 2011 |
Pages: | 413 |
PDF File Size: | 20.82 Mb |
ePub File Size: | 10.24 Mb |
ISBN: | 583-3-15721-723-3 |
Downloads: | 94387 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Kagore |
Prosecutor Talks of “Human Error” in Overpass Collapse
The jacks, which have the same function as those used to change the wheel on a car, are usually operated by a control unit, which may have malfunctioned, causing the overpass to lean to one side and subsequently collapse. Berufsvildungsbericht translation by Simon Tanner www. Work on 11 of these had already been completed without any problems.
The subcontract in question, for example, involved raising 13 overpasses on a kilometre stretch of motorway. This is another line of inquiry that investigators are considering.
Investigations will therefore also berutsbildungsbericht on the quality of the concrete used in the piers.
Red tape blocked work on Genoa bridge despite safety concerns Florence, a meter-long chasm opens up under Lungarno TorrigianiThe Mayor: The four Romanian workers who were working on the construction site where two people died yesterday have already been interviewed, and the prosecutor of Ancona, Irene Bilotta, has opened an investigation for multiple manslaughter, which may soon be extended to include the further offence of causing a disaster.
The work was being carried out to ensure a distance of 5. This distance had fallen below required levels as a result of work to widen the motorway from two to three lanes, which also involved raising the road surface by by centimetres.
Perhaps the temporary piers had not been properly anchored, or the jack control unit was faulty. It is thought that cause of the collapse may therefore have been related to the temporary supports on which the jacks used to lift the central section of the overpass had been placed. Genoa bridge collapse is?
Corriere della Sera – Ultime Notizie – International
Work commenced in May and was scheduled for completion in September A casa di Steve Bannon: Ministry experts The Minister of Infrastructures and Berufsbildungsbreicht, Graziano Delrio, meanwhile, has already appointed a commission of experts to analyse what happened. They added that motorways are closed to traffic — usually at night — only when a new bridge is being built to replace an old one.
One last question, however, remains: We were simply carrying out scheduled maintenance. Only then can we establish at what stage mistakes were made.